Lilly White Marble Kitchen, Bar, Pantry and Backsplashes for Livia B.

Project: Multi-stage kitchen countertop, island, bar, pantry, backsplash and laundry installation
Client: Livia B.
Main material: Lilly White Marble
Laundry material: Apuano Quartz
Total project area: Approximately 282.9 sq. ft.
Main edge: Demi-bullnose
Kitchen sink: Customer farmhouse sink
Bar sink: Customer-provided sink
Project start: May 11, 2026
Project completed: July 20, 2026
Project manager: Iurii Pirogov

Livia's project was much larger than a standard countertop installation. We were working through a full kitchen with a large custom island, long perimeter runs, a separate bar and pantry, then coming back for the matching backsplashes and a laundry countertop. Altogether, the quote covered approximately 282.9 square feet of stone. 

The main material was Lilly White Marble. I liked it for this house because the kitchen was already being built around white cabinetry, light wood floors and a lot of natural light. The marble does not introduce a hard contrast. Its soft gray movement gives the surfaces enough character while keeping the entire room light.

The shape of the kitchen made fabrication more interesting than the color choice. Livia wanted generous overhangs, the island had a large curved end, and several long pieces had to meet cabinetry, walls and appliances that were still part of an active construction site. We divided the project into stages instead of trying to fabricate every surface from one early set of measurements.

Planning a 282.9-Square-Foot Stone Project

The drawings changed significantly as the house progressed. Our project file reached Revision 24, which makes sense for a job with this many separate surfaces and construction happening around us. The main kitchen included an 84-inch section, another run approximately 108 inches, and a long side extending to about 166 inches. The island was approximately 120 inches long by 69 inches wide, with a rounded end that had to follow the custom base rather than a simple rectangular cabinet box.

There was also a separate bar with a run originally shown around 170 inches, plus a pantry section approximately 133.5 inches long. The bar included its own sink, while the main kitchen had Livia's farmhouse sink.

I supervised the layout decisions because there were several places where the drawing alone was not enough. The fabrication notes specifically called for the team to check with me on the seam location for one of the smaller pieces and on the front overhangs because Livia wanted them as generously as we could reasonably make them. We also added a radius to the exposed left corner of the smaller section near the refrigerator. Those details sound small compared with a 120-inch island, but exposed corners and overhangs are the parts people interact with every day. I would rather settle them before cutting than try to make the design decision during installation.
Lilly White Marble slab layout for countertop fabrication.

May 11: Starting With the Island and Choosing the Demi-Bullnose Edge

Our first scheduled installation was Monday, May 11, with the island and bar listed as the first stage of the project. The island was the piece I wanted to establish early because it controlled the center of the room. At roughly 120 by 69 inches, it is not a surface you can treat as an oversized rectangle and hope it works once it arrives.

The base had a custom curved end with fluted detailing. Our template followed that shape closely so the stone could finish the furniture instead of hiding its design. The template photos show how many individual strips were used to build the curve and establish the real perimeter before fabrication. That is one of the reasons I still put a lot of value on a physical template for this type of work. A custom cabinet can look symmetrical from across the room and still vary enough at the edge to matter when stone sits directly over it. This stage used 73.7 square feet of Lilly White Marble. The material gave us a broad, quiet surface over the large island instead of making the center of the kitchen visually heavy.

Livia wanted a softer edge than a standard flat profile, so we used a demi-bullnose on the marble. Before committing the project to that edge, Gustavo made a sample. That gave us something real to look at rather than choosing an edge profile from a small diagram.

I like doing that when the edge will repeat across a project this large. A profile that looks minor on a sample becomes a strong visual line once it runs across a 120-inch island, a 170-inch bar and the rest of the perimeter. The demi-bullnose worked well here because it softened the marble without making the edge decorative. It also suited the rounded island much better than a very sharp profile would have.
Template for the curved kitchen island countertop.
Physical template on the curved kitchen island.

June 22: Installing the Perimeter, Bar and Pantry

The second major installation was scheduled for Monday, June 22. This stage covered approximately 131 square feet of Lilly White Marble across the kitchen perimeter, bar and pantry. By this point the cabinet layout was established, so we could work from the actual conditions instead of early construction dimensions.

The perimeter was especially long. One side extended approximately 166 inches, and the stone had to work around the farmhouse sink, cabinet changes and the return into the rest of the kitchen. We followed the final template closely and reviewed seam placement where the long runs had to be divided. The bar created another type of problem. A 170-inch run is very visible because there is little happening on the surface except the sink. Any poor transition or awkward edge condition would stand out. The pantry was simpler in shape but still long at approximately 133.5 inches.

Livia also wanted as much front overhang as the construction would reasonably allow. That was something we checked rather than applying one default dimension everywhere. On custom cabinetry, especially with curved or decorative fronts, I want the overhang to follow the cabinet visually instead of looking like the same number was copied around the room.

Both sink areas had to be treated differently. The kitchen used Livia's farmhouse sink. Unlike a conventional undermount sink hidden below the countertop, a farmhouse sink becomes part of the front elevation of the cabinets. The countertop pieces beside it therefore have to meet the sink cleanly rather than simply surround a cutout in the middle of a slab.

The bar used a separate customer-provided sink. That opening sat within a very long straight surface, so its position mattered to the overall balance of the run as well as to the cabinet below. These are the kinds of details that make a large countertop project feel custom. The material can be the same throughout the house, but every opening and cabinet condition gives us a different fabrication problem to solve.
Lilly White Marble countertop installation in progress.
Kitchen countertops during the Lilly White Marble installation.
Lilly White Marble countertops installed in the kitchen.

July 13: Cutting and Installing the Backsplashes

We scheduled the third stage for Monday, July 13, specifically for the backsplashes. We had intentionally left enough Lilly White Marble from the earlier fabrication so the backsplash pieces could be cut on the second trip. I did not want the team consuming usable material during the first stages and then trying to find something that merely looked similar when it was time to finish the walls. The bar backsplash was one of the pieces we fabricated without a physical template. We had a confirmed dimension of 161 inches by 4 inches, so we divided it into two 80.5-inch pieces with the seam at the center. The pantry backsplash was also a long, narrow piece at approximately 133.5 inches by 4 inches.

Those are simple shapes, but long backsplash strips have very little tolerance for errors. If the length is wrong, there is nowhere for the mistake to disappear. The ends, seam and relationship to the countertop are all visible. The kitchen backsplashes were more involved because they followed the perimeter cabinetry and had to meet the upper cabinets and wall conditions already in place. We protected the new counters and cabinets carefully while working above them because by this point several other trades were still active in the room.
Lilly White Marble bar countertop with sink cutout.

Why We Saved Material Instead of Cutting Everything at Once

Material management mattered on this project. We planned the Lilly White Marble by stage and kept usable sections for later work instead of trying to turn the full slab inventory into finished pieces immediately. That gave us material from the same project stock when it was time to fabricate the backsplashes.

I would rather protect a good remnant than waste it because today's cut sheet happens to be finished. On a project that stretches over multiple visits, that can make the difference between keeping the stone consistent and having to introduce another slab later.

July 20: Final Work and the Laundry Countertop

Our last scheduled visit was Monday, July 20, for finish work and the laundry area. The laundry countertop was a smaller project within the larger job, approximately 10 square feet, and used Apuano Quartz rather than Lilly White Marble. Livia preferred the lighter area of that piece, so we oriented the layout toward the upper-left portion of the material where the appearance was softer. We used a demi-bullnose edge here as well, which kept the edge treatment related to the rest of the project even though the material changed.

I also asked the shop to preserve the remaining Apuano remnant rather than break it down into scrap. The useful remainder was marked as sold for another project. That is something customers rarely see, but it is part of fabrication. Good stone is expensive, and a usable remnant is still material. I do not see a reason to waste it just because the original job only needs ten square feet.
White marble slab with soft gray veining.
Lilly White Marble countertop and backsplash in the kitchen.
Long Lilly White Marble countertop in the pantry area.
Lilly White Marble countertop installed below the windows.

What Livia Got

Livia's project took place over more than two months because we were not installing one countertop into a finished room. We were working alongside a larger build and returning as different areas became ready. The first installation on May 11 established the large island and its curved end. On June 22, we moved through the perimeter, bar and pantry. We returned July 13 for the backsplash stage, then finished the remaining work and laundry surface on July 20. The finished kitchen has a lot of marble, but it does not feel overwhelmed by stone. The Lilly White stays close to the palette of the cabinetry and walls, and its movement becomes more visible only when you get closer. That was important in a room this large. A much louder pattern across nearly 300 square feet would have changed the entire character of the space.

The island is still the main piece for me. It is large enough to dominate the room, but the curved stone edge follows the fluted cabinet below instead of making the island feel like a block. The demi-bullnose softens that perimeter further. The bar, pantry and long kitchen runs use the same material, so the rooms read as parts of one project instead of separate stone purchases. The matching backsplashes finish those surfaces without adding another color or pattern.

A project like this is not difficult because one countertop is unusually complicated. It is difficult because there are a lot of decisions that have to remain consistent from May through July. We kept the templates, edge profile, overhang decisions, material allocation and later backsplash cuts connected throughout the job. That is what made the finished stone look like one installation instead of four separate trips.